| Amplia��o do Tribunal de Li�ge | |
| Localiza��o: | Li�ge, B�lgica |
| Projeto: | TPF Engineering, B�lgica |
| Dados T�cnicos: |
Arquitectura arrojada Superestrutura com 3.000m2 de �rea total |
|
�The huge advantage of Advance Concrete is that for a team which manages modeling reinforcements, the use of the software is natural, therefore the training investment is reduced to a minimal.� Ms. Evelyne Lacroix, Gestora do Projecto |
|
|
|
|