Centro de Exposi��es
Localiza��o: Brno, Rep�blica Checa
Projeto: OKF s.r.o, Rep�blica Checa
Dados T�cnicos: 20.000m2 de �rea coberta
220,3m de comprimentos por 89,5m de largura
Peso total de 2.400,0t


�With Advance Steel, the 3D modeling of steel frameworks of �Pavilion P� enabled the realization of the model complexity and the detail control in the workshop documentation. To expedite the tube structure fabrication, the information from the 3D was directly used for the fabrication of particular elements. Using Advance Steel improved the demanding deadlines both for the project and for the steel structure delivery period.�
Mr. Vladimir Danek and Mr. Michail Rudolf, Technical designers